250816 KPM Group

Summary of activity / statement of account

(12 May – 12 Sept. 2025 – 25 hours)

Website Maintenance & Development

May 2025

12th May 2025

  • KPM footer member logos section updated, logo removed from multiple pages
  • Plant List updated

13th May 2025

  • Logos updated
  • (Site speed optimisation required – noted: site very slow)

14th May 2025

  • Initial site performance investigations (frequent server errors)

June 2025

4th June 2025

  • KPM plant list updated

July 2025

8th-9th July 2025

  • Hosting Support: Web hosting correspondence and technical support

15th July 2025

  • Access Management: CrazyDomains admin (coordination with Warren)
  • Backup & Development: Live site backup downloaded and local site creation initiated

16th July 2025

  • Local Development: Successful local site development and import process

17th July 2025

  • Server Migration: SiteGround server setup and configuration completed
  • Migration Process: Full site migration executed (detailed notes – 17/07/25)

August 2025

1st August 2025

  • Website Maintenance: Gravity Forms updated to v2.9.1.3, including GF Akismet plugin installation and GF ReCAPTCHA v3 setup

5th,6th August 2025

  • Updates: All WordPress plugins and theme updated
  • Charities page updated with new VAT-free charity mailings section
  • Performance Optimisation: Website database and Elementor optimisations completed

7th August 2025

  • Page Development: Downloads page updated with 3 new PDFs and refined design
  • New Page Development: Branded Envelopes page design & development.

10th August 2025

  • New Page Development: Membership Card Printing page design & development.
  • Content Sourcing: Images acquired for new pages

13th August 2025

  • Responsive Design: Tablet and mobile layouts created for new pages
  • icon designs

16th August 2025

  • Mobile Optimisation: Enhanced mobile layout for new pages and footer
  • Icon Updates: Social media icons updated (Twitter changed to X)
  • Mobile testing and refinements

16th-21st August 2025

  • Update/report drafted
  • Analysis of website (focus on home page) loading speed & structure; thorough investigation into load speed issues.. Optimisations made to home page. 540x Images converted to .webp (‘Siteground Optimizer’ webp image conversion – future conversion automatically). Testing, troubleshooting.
    [Discovered & fixed a previously ‘hidden’ (invisible) element in the footer section of all pages where an old/unused grid created with Essential Grid was unnecessarily loading numerous (large) .png images! Removed this completely and it instantly reduced data loading on all pages significantly]

22nd August 2025

  • Further analysis, attempted further optimisations (issue found with render blocking javascript and blog carousel)
    [corr. w/Emma re Analytics]
    Statistics from SiteGround prepared.

28th August 2025

  • Unicode ‘strange character’ issues resolved. Improvements made to Blog page with focus on tablet & mobile – grid , mobile filter, customisations to reduce amount of space required for categories, new mobile-specific layout of latest posts slider designed. Blog single page template updated (improved layout for tablet and mobile).

September

5th September

  • Analytics issue investigated and resolved (Site Kit disabled, reverted to manual insertion of GA4 tag code)

11th September 

  • New Page Development: FAQs page design & development.
  • FAQs links added to header & footer menus (under ‘about’).

12th September

  • New section with link to FAQs page added to Direct Mail page. Direct Mail page layout improved (condensed “types” section). Two new sections with links also added to Membership and Print Services pages linking to new Membership Card Printing and Branded Envelopes pages. Layout improvements on Print Services page (blue section condensed on mobile).


[Total:  25 hours]